Construction Punch List Template

A free construction punch list template. List what still needs fixing on the final walkthrough, add photos and sign it off with the client.

Use template

Customize the pages and design to fit your needs.

Final walkthrough.

List what still needs fixing in each area, add photos, and sign the punch list.

About this template

Walk the job with the client or architect and record every item left to fix or finish, room by room, with photos and the trade responsible. The signed punch list goes to your team as a PDF.

Common uses

  • Final walkthroughs with clients
  • General contractors closing out jobs
  • Remodelers and home builders

Key features

  • Room by room items
  • Photos and trades to call back
  • Signed punch list as a PDF

What this template asks

  1. What's your name?

    Short Text

  2. What's your email address?

    Email

  3. Which project is this for?

    Short Text

  4. What's your role on the project?

    Single Choice · Client or owner, General contractor, Architect or designer, Subcontractor

  5. When was the walkthrough?

    Date

  6. Which area are you listing items for?

    Short Text

  7. List each item to fix or finish

    Long Text

  8. Which trades need to come back?

    Multiple Choice · Optional · Painting, Drywall, Electrical, Plumbing, Carpentry and trim, Flooring, Cleaning, Something else

  9. Upload photos of the items

    File · Optional

  10. When should the items be finished?

    Date · Optional

  11. Sign the punch list

    Signature

How to use this template

  1. Copy it

    Select Use template and a copy opens in your workspace as an unpublished draft.

  2. Make it yours

    Edit any question or answer, choose a theme, and add your logo.

  3. Share it

    Publish, then send the link, show a QR code, or embed the form on your site. Responses arrive in Submissions.

Frequently asked questions

What is a punch list in construction?

A list of small items still to fix or finish near the end of a job, such as paint touch ups, missing trim or a sticking door, made during the final walkthrough.

Who creates the punch list?

The client or owner walks the job with the general contractor, and sometimes the architect. Each person can submit items for their area.

How do I track punch list items?

Each submission saves the items, photos and trades needed. Send responses to Google Sheets to mark items done as your crews finish them.